We will perform the updating of the level 2
switching equipment.
This operation will be done at night, between 01h and 07h in the morning
from Tuesday, 08/06/2010 until Friday
11/06. It will cause a network interruption of approximately 3 minutes
on each network of dedicated servers.
Update(s):
Date: 2010-06-11 07:58:26 UTC we still have two more switches to update.
The operation will be done during Friday night 11 until Saturday 12 at about 4 am.
Here are the concerned networks:
188.165.192.0/24
188.165.193.0/24
Date: 2010-06-08 23:47:32 UTC Operations will continue tonight.
Date: 2010-06-07 18:38:20 UTC We will start reboots of switches this night.